Countertops, considered.

Stone selected around the cabinet color, the room’s light, and the way the kitchen is used every day.

Light stone countertop and full-height slab backsplash in a finished kitchen
What’s included

From the slab yard to your kitchen.

We handle every step of a countertop project — selecting the slab at the yard, templating in your kitchen, fabricating in the shop, installing with seams planned to be as discreet as the slab, layout, and material allow, and sealing the stone when the material calls for it.

01 / Template

Laser-templated in place.

Once the cabinets are set and level, we laser-template the entire run in your kitchen — sink cutouts, faucet holes, edge profile, overhang. Templates go straight to fabrication, no field-fitting later.

02 / Fabricate

CNC, then hand-finished.

Slabs are CNC-cut to template, then hand-polished on the edge profile of your choice (eased, beveled, mitered, ogee). Sink cutouts honed smooth. Seams planned to be as discreet as the slab, layout, and material allow.

03 / Install

Set, sealed, ready that day.

Stone is set on prepared cabinet runs, leveled as the approved installation requires, and seamed according to the documented plan. Sealers, handoff timing, and kitchen-use instructions depend on the selected material and project scope.

The materials

Quartz, quartzite, porcelain, marble. And butcher block when it fits.

We work primarily in engineered quartz, natural quartzite, porcelain, marble, and granite. Butcher block is available for islands or specific runs when it supports the project direction.

Slab selection happens at the yard, not from a sample chip. We meet you there, pull three slabs in your candidate range, and you pick the one. The slab you choose is the slab that lands in your kitchen — tagged at the yard, photographed, and tracked through fabrication.

Materials
Quartz, quartzite, porcelain, marble, granite, butcher block
Edge profiles
Eased, beveled, mitered, ogee
Lead time
Confirmed after material, template, fabrication, and site-readiness review
Install
Scheduled for the approved scope and trade coordination
Investment
Countertop pricing depends on material, slab variation, seam plan, edge profile, and install scope. Quartz on the lower end, exotic quartzite and marble on the higher. Plumbing, sink reconfiguration, and disposal are scoped separately. Every project is quoted on a written proposal after an in-home template visit.

Begin a Project  →

The slab library

Browse quartz, quartzite, marble. Or meet us at the yard.

Our online catalog covers the patterns we stock most. The full library lives at the slab yard — we meet you there to pull options, hold them under your kitchen lighting samples, and pick the actual stone.

Browse the catalog

Countertops are the most material-driven of our services. Here’s what we cover before you commit.

Can you do countertops without painting the cabinets?

Yes. Countertops are a stand-alone service. We confirm the existing cabinets are level, stable, and suitable for the selected material, then coordinate the slab, edge, sink, and installation without requiring a cabinet-finishing project.

Quartz vs. quartzite vs. granite vs. marble — how do I choose?

Quartz: engineered stone; typically no sealing; predictable pattern; use trivets for hot pans. Quartzite: natural stone; usually sealing; stronger heat tolerance than quartz; one-of-one movement. Granite: natural, durable; sealing and maintenance depend on the stone. Marble: high-movement look; sealing; etches from acids. Porcelain slab is also in the planning library when the product fits. We compare families at the yard against cabinet samples; price is a written proposal after templating.

How long is the lead time?

Lead time depends on material availability, slab approval, template, fabrication, site readiness, trade coordination, and the current calendar. Your current project schedule confirms the planned sequence.

Do you handle the sink and plumbing?

The written scope identifies sink and faucet cutouts and who owns plumbing disconnect and reconnect. We coordinate the approved handoff, but plumbing work is included only when the project records say so.

Choose the next useful step.

Book a kitchen visit when the project is ready to measure, or send photos first when you are still comparing material directions.

Book an in-home estimate

Share the project address, then choose from live appointment availability.

See Live Availability

Walk the yard with us.

Tell us the material direction, project address, and planning range. We’ll review whether a slab-yard visit is useful and what needs to be confirmed before pricing.